-- card: 90432 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Setting Calendars -- part 1 (button) -- low flags: 00 -- high flags: A003 -- rect: left=10 top=149 right=168 bottom=217 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Calendars and Resources ----- HyperTalk script ----- on mouseUp go card id 37714 end mouseUp -- part 2 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=136 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: -- part 3 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=57 right=72 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 4 (button) -- low flags: 00 -- high flags: A003 -- rect: left=257 top=109 right=128 bottom=446 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Calendar Window ----- HyperTalk script ----- on mouseUp go card id 81748 end mouseUp -- part 5 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part contents for background part 31 ----- text ----- Setting Up a Project -- part contents for background part 32 ----- text ----- Setting Calendars -- part contents for card part 2 ----- text ----- Calendars specify the hours per day and which days of the year a resource (a person, group, machine, and so on) can work. MacProject II uses calendars to determine how long tasks take based on the resources assign to them. -- part contents for background part 6 ----- text ----- -- part contents for card part 3 ----- text ----- To set a calendar: -- part contents for background part 7 ----- text ----- Choose Show Calendar Info from the Dates menu. Important: Black in the Calendar window represents working time, and white represents time off. This is the opposite from earlier versions of MacProject, in which white meant working time. -- part contents for background part 28 ----- text ----- 1. -- part contents for card part 5 ----- text ----- 1 of 7